Harahan Pump to the River North and South Discharge Tubes are now Under Design
The North Tube location includes design of three 84” diameter discharge pipes extending 1,709 feet from the pumping station to the Old Dickory Oak Tree. The south tubes include design of three 84” diameter discharge pipes extending 4,475 feet from the Old Dickory Oak Tree to the Jefferson Highway.
Soniat Canal (Lynette to W. Napoleon) is Under Construction
Project consists of a 900 foot section of trapezoidal concrete channel between the Lynnette Bridge and West Napoleon Avenue
Estimated Cost: $10.7 million
Gardere Canal (Phase 3) Murphy Canal (Phase 2) Under Construction
Project consists of drainage improvements (slope grading and slope paving) to the Gardere and Murphy Canals from the south side of Martin Luther King Playground to Bayou Barataria. The approximate length of improvements is 15,000 linear feet.
Estimated Cost: $23.5 million
Soniat Canal from W. Metairie to Lester Under Design
Design of approximately 500 linear feet of modified trapezoidal concrete channel between Lester Avenue and West Metairie and replacement of the westbound West Metairie Avenue Bridge. This project is scheduled to be under construction by 2013.
Estimated Cost: $9.0 million
Industry Canal Improvements
Project consists of canal improvements from Bayou Oakwood to Bayou Barataria and includes removal of three (3) – 96” reinforced concrete arch pipes and installing 3,050 linear feet of 42 feet wide “U” frame section.
Estimated Cost: $27 million
Soniat Canal from Lynnette to W. Napoleon is Under Construction
Project consists of a 900 foot section of trapezoidal concrete channel between the Lynnette Bridge and West Napoleon Avenue. Construction began in September of 2009 and is scheduled for completion in early 2012.
Estimated Cost: $10.7 million
Industry Canal Improvements on the West Bank now in the Design Phase
Project consists of canal improvements from Bayou Oakwood to Bayou Barataria and includes removal of three (3) – 96” reinforced concrete arch pipes and installing 3,050 linear feet of 42 feet wide “U” frame section.
Estimated Cost: $27 million
West Bank Trapp Canal Improvements in Design Phase
Project consists of canal improvements from Bayou Fatima to Bayou Barataria. When the project is complete, it will have 7,500 linear feet of modified trapezoidal section with a bottom width between 60 and 70 feet and a top width of approximately 155 feet.
Estimated Cost: $15.2 million
Justice / Oil Company Canals in Design Phase on the West Bank
Project consists of a combination of 4300 feet of earthen trapezoidal channel and 4000 feet of concrete lined trapezoidal channels. This project will be advertised early this year.
Estimated Cost: $14 million
Mayronne Canal on the West Bank: Nearing Construction
Project consists of improvements to Mayronne Canal from Dugues Canal to Westwood Drive. The improvements will be a combination of 1300 feet of earthen and 1860 feet of concrete-lined channel. This project will be advertised early 2011.
Estimated Cost: $5 million
Two Mile (Patriot Canal) Phase 2
This project will consist of building a concrete “U”-frame section of canal between Bara taria Boulevard and Allo Street and constructing three bridges in that section of canal. This project has been advertised and construction will begin in early 2011.
Estimated Cost: $20.8 million